How it works

A QA firm’s whole job is to prove everything was done right.

A site or facility is full of expensive, mission-critical assets — machines, rooms, equipment, installations. The QA team is the one who proves each one arrived undamaged, was installed correctly, passed its checks, and has all its paperwork. Veristep turns that proof from a manual grind into an enforced, self-writing record.

The same QA business, three ways

Today, on spreadsheets & email

Clipboards, spreadsheets, and email. One real firm's guide calls for 17 logs and 200+ document types across 27+ equipment types. People type what they saw (hopefully same-day), email subs over and over for missing reports, hand-write the daily report each evening — and spend weeks at the end assembling the closeout from folders and inboxes.

With today's software (Procore, CxAlloy, Autodesk Build…)

A real improvement — one shared place, checklists on iPads, photo uploads, dashboards. But every one is a filing cabinet with a screen. It records; it doesn't enforce. A checklist can close without the required photo. Humans still do all the chasing. Closeout is still weeks of digging — just inside the software. And the record ends at handover.

On Veristep

You set the hold points once. The crew captures the proof on the job — a photo, a reading in range, a signature, an uploaded record. A step with its proof missing stays open, and the database is what refuses, not the screen. Every page that closes is already in the package, so there is nothing to assemble at the end. The record stays readable years after the job is signed off.

The core rule

Every asset walks a defined, traceable path

Templates define the path for each discipline — modeled as an explicit state machine with required evidence per phase, not free-form status text. Here’s a commissioning example; each step becomes a permanent, attributed event.

  1. 1
    Design QA signed off
    Requirements pass feasibility and testability checks; disciplines sign off before construction, and any shortfall becomes an approved deviation with residual-risk.
  2. 2
    Requirement identified
    Becomes a document-register row: required, not yet requested.
  3. 3
    Submittal approved
    Submittal register + approval state machine.
  4. 4
    Material received
    Receiving log + the asset's lifecycle phase moves to received.
  5. 5
    Installation observed
    Observation record with gated photo evidence.
  6. 6
    Test records collected
    Attributed to the qualified party who performed the test.
  7. 7
    Deficiencies tracked
    Deficiency log with severity and an aging clock.
  8. 8
    Corrective action documented
    NCR / CAPA with closure evidence.
  9. 9
    Commissioning complete
    Levels L0 to L5 (CSI 01 91 00), each gated by evidence and earning a physical color tag on the asset: pre-functional → functional → integrated.
  10. 10
    Turnover accepted
    Package index with completeness % and client acceptance.
  11. 11
    Closeout archived
    Immutable, exportable — and already assembled.

A boundary the software respects: the QA firm reviews, observes, documents, reports, and consults — it does not install, test, or commission. Every test record is attributed to the party that performed it. That’s a legal line, not a nicety.

Where the saved money literally comes from

Labor

Chasing documents, writing reports, and assembling closeout is the bulk of a QA firm's payroll. Agents do it for pennies per action. One firm runs more projects with the same people.

The end-of-project cliff

Weeks of closeout assembly become zero — the single biggest chunk of recovered time.

Disputes & rework

When a warranty claim or failure argument lands years later, the unforgeable record answers it instantly.

Missed items

A missing document caught in week 2 costs an email; caught at closeout it costs a crisis. The system always knows what's supposed to exist.

Watch the closeout assemble itself.

Tour the product