Skip to content
Two quality-assurance professionals reviewing an inspection checklist together on a rugged tablet in an equipment room
About Veristep

We have watched closeout go badly. This is the fix.

Six weeks from turnover, somebody asks whether the building is ready, and everybody starts looking for answers — in inboxes, in twenty spreadsheets, on phones. Veristep began with that afternoon. We set out to build a record that keeps the proof with the work from the first day, so the end of the job is a review, not a hunt.

What we believe

Four things the product is built on.

A record should be able to say no

The most useful thing a quality record can do is refuse. A step without its proof stays open, for everyone, no exceptions.

The busywork is not the job

Chasing documents, drafting reports and assembling closeout is where a firm's best people lose their week. Veristep drafts that; a person decides. Your people should be on the floor, not in the inbox.

The record outlives the job

A building runs for decades. So should its record. It moves to the owner at handover and keeps running — maintenance, warranty, and a warranty claim in year six, answered with what was recorded back in month two.

Say what's ready, and what isn't

The security page lists what's ready and what isn't. We'd rather tell you than let you find out. If we don't have a certification, the page says so.

Founder-owned

Owned by the person who built it. No investors steering the roadmap, and no parent company waiting to fold it into something else. So the product goes where the jobs need it to go, and the record you start today is still here in year six. And if you want your own company's name and logo on every screen, you can have that too.

Built with the people doing the work

Shaped on data-center jobs alongside working QA and commissioning teams, so it fits how the work happens in a mechanical room, not how a spec imagines it. We’re opening spots for the first ten firms to run a real job on it, help shape what we build next, and put their name on this page if they want.

Data centers first

The heaviest commissioning load and the hardest turnover deadline. The same templates run anywhere quality has to be proven — a hold point is a hold point in a data hall, a hospital wing or a plant.

Come see the record on a real job.