For building owners

Know what's actually ready before you accept the building.

You are paying for verification you cannot personally witness. With Veristep in the spec, the proof arrives as the work happens — from every firm on the job, in one shape you can read — and you keep the record after everyone has gone home.

What you get

Three things that change on the first job.

1

See it before you sign for it

What's installed, what's been inspected, what passed, what's still open, where the evidence is and who approved it — during the job, not in a binder at the end.

2

The same shape from every firm

Put Veristep in the spec and every commissioning firm, contractor and sub on the job records the proof the same way, into one record you can read without a translator.

3

A building record, not a box of documents

At handover the record moves to you: every machine with its tests, documents, warranty and history, ready to run maintenance on from day one.

The rule, for you

A check your firm cannot close without the evidence you asked for.

The hold points are set once, from your requirements. A step that asks for a photo, a reading in range, a signature or a document stays open until that exact thing is there — and nobody can tick it closed on their word, including an administrator at the firm.

  • The completeness figure on the closeout package is the register itself, not a percentage somebody typed
  • Corrections are added and signed, never overwritten — you can see what changed, who changed it and when
  • You accept the handover inside the record, under named terms, and the firm keeps its own sealed copy of the work
  • Years later, a warranty claim or a failure argument is answered by the record: what was installed, who checked it, what the reading was, on which day
A Tuesday in month four

You open the portal. Data Hall A shows 27.8% of required documents approved and two machines in the ready column. UPS-101 is there because its delivery inspection, anchor torque reading, nameplate photo and installer signature all closed — you can open each one. ATS-101 is not, and the register says exactly which two documents are still owed and by whom.

Nobody sent you a status report. Nobody had to. When the job is ready to turn over, the package you will accept is the one you have been reading all along.

See it on a real project

The tour opens on the owner's view of a real project: the package, the ready column, the gaps.

Seven screens, live from a real job, no account.

Next

Talk to Veristep about a program

An owner program — Veristep mandated across firms and sites — is priced under an agreement, not the published firm price. The conversation starts with what your spec needs to require.