For QA/QC teams

Make sure required inspections and evidence don't get lost.

You know what is supposed to exist on this job — every inspection, every test, every document per machine per phase. The trouble is that spreadsheets only know what showed up. Veristep knows what is owed, and holds the line on every one of them.

What you get

Three things that change on the first job.

1

The register knows what is owed

Required per machine, per phase: 200-plus document types across the disciplines, the tests, the inspections. Missing items surface early because the system knows the denominator, not just the numerator.

2

A hold point cannot be passed on somebody's word

Each step names the proof it needs — a photograph, a reading in range, a signature, an uploaded record — and stays open until that exact thing is there.

3

Non-conformance, closed with proof

NCR to corrective action with the closure evidence attached, and a days-open clock on every deficiency so nothing rots quietly.

The rule, for you

The same rule for the office, the field device, an import and an administrator.

The refusal is not the button being greyed out. The same answer comes back no matter how the close is attempted, and a closed step stays exactly as it was closed — corrections are added, attributed and dated, never written over.

  • Commissioning levels L0–L5, each gated by evidence, worn as a colour tag on the asset
  • Design-phase QA: requirements checked for testability, disciplines signed off before construction, shortfalls recorded as approved deviations
  • Qualified-party attribution on every test; identity-bound signatures on every sign-off
  • One engine for every discipline — machines, rooms, pours, fire doors, electrical and civil inspections, FATs
Week two, not week twenty

The register shows 12 documents required and not yet requested on the chillers. That is the moment to chase, not month six. The requests are drafted; you approve them in one pass.

On Thursday an inspector tries to close a functional test with the reading typed in from memory. It is out of range. The step stays open. That is the record earning its keep.

See it on a real project

The tour shows a case that cannot close and, two screens later, exactly what held on the one that did.

Seven screens, live from a real job, no account.

Next

Start your free trial

Thirty days, no card, your whole crew, every feature. A workspace with a job already in it. Exports and downloads switch on when you upgrade.