Quality that knows what is owed, not just what showed up.
The register lists every inspection, test and document each machine owes, per phase, from day one. A gap shows in week two while the sub is still on site — not at closeout. And the record starts before anyone breaks ground.
What changes on the job.
Catch the gap in week 2, not week 20
The register knows what is supposed to exist, not just what showed up — so a missing inspection or document is caught early.
Requirements checked for testability
Every requirement gets a feasibility and testability check up front, so you never discover in the field that a spec cannot actually be verified.
Disciplines sign off before construction
Each discipline reviews and signs off on the design, on the record, before work begins.
Shortfalls become approved deviations
When a requirement cannot be met, it becomes a formal, approved deviation with its residual risk written down — not an untracked gap.
Attributed to the party who did the work
Every test names who performed it and who witnessed it. When a dispute lands, that line matters.
The front of one unbroken record
Design decisions live in the same record as install, commissioning and closeout, so the story is complete from the first review.
A hold point cannot be passed on somebody's word.
Each step names the proof it needs and stays open until that exact thing is recorded — for the technician, the office, an import and an administrator alike.
Seven screens, live from a real job. No account.
Put one of your jobs in it.
Thirty days, no card, your whole crew, every feature. A workspace with a job already in it. Exports and downloads switch on when you upgrade.