The lists, before you start.
Free, downloadable, no account. Each one is generated from the defaults Veristep builds a project from — so what you download is what the software would have set up.
Three today. More as the library grows.
The QA document register
Every document each machine owes, by lifecycle phase, and who usually supplies it — 23 equipment types, 35 document types. Excel or CSV. Generated from the same defaults Veristep builds a register from, so it is the real list, not a sample.
The closeout checklist
The nine stages a turnover package has to pass through before an owner can accept it — inspections, punch list, documents, as-builts, spares, training and warranty. Excel or CSV, grounded in the closeout items Veristep actually tracks.
The ITP (inspection & test plan)
Hold point, inspection type, acceptance criteria and sign-off columns across five disciplines — electrical, mechanical, controls, fire & life safety, civil / structural. Excel or CSV, real hold points, not a blank grid.
A per-discipline commissioning checklist and a deficiency log are next.
Tell us which discipline you would use first and it moves up the list.
Bring it straight in — no retyping.
Upload the file you filled in. The ITP becomes your inspection templates, with their steps, readings and hold points; the closeout checklist and the document register become the documents every machine owes. You see what each row becomes before anything is saved.
