The closeout checklist, before you're staring down the last week of the job.
The nine stages a turnover package has to pass through before an owner can accept it — inspections, punch list, documents, as-builts, spares, training and warranty — grounded in the closeout items Veristep actually tracks, not a generic list.
- Nine stages. Inspections & tests, punch list, documents received, as-builts, spares & attic stock, maintenance requirements, training, warranty, and owner acceptance — in the order a package actually closes.
- Twenty rows. One row per real closeout item, each grounded in the document types Veristep tracks by default — not a generic list off the internet.
- The working columns. Status, owner, and a reference column pointing at the document or evidence the row is asking for. Sort by Status and you have the punch list of what closeout still owes.
- A rule about stage 9. Nothing in owner acceptance should be checked until every row above it is — the same order the platform enforces on a real project.
Download
Excel workbook — the checklist and how to use it. No account, no card.
Rather not leave an email? Just download the .xlsx · or the CSV
A few of the rows
| Stage | Item | Status | Owner |
|---|---|---|---|
| 1. Inspections & tests | Anchor / torque inspection recorded | required | Field / QA |
| 2. Punch list | Every deficiency has closure evidence | required | Trade / GC |
| 3. Documents received | O&M manual | required | Manufacturer |
| 4. As-builts | As-built drawings submitted | required | GC / design team |
| 7. Training | Training sign-in sheet | required | Owner's team |
| … and 15 more, across nine stages. | |||
What the spreadsheet cannot do is confirm the row is actually true: a cell can say done with nothing behind it. That is the difference between a checklist and a record, and it is what a closeout package on Veristep is built to be — a live list that runs out, not a sheet somebody swears is current.