There is nothing to assemble.
Every page that closed is already in the turnover package, attributed and dated. On day one the package knows everything it will need; on the last day it is done. The owner reads it in their portal, accepts it there, and the record moves to them.
What changes on the job.
The closeout is already done
Day one it is 0% and knows exactly what is missing; the last day it is done, automatically.
Hand over in a review, not in weeks
Turnover packages carry a real completeness figure and the owner's acceptance, exportable at any moment.
The owner watches it fill in
An owner portal shows the register, its gaps, the open deficiencies and the evidence — during the job, not at the end.
The site moves to the owner
The firm offers the finished site inside the platform; the owner accepts under named terms and runs maintenance and warranty on the same record. The firm keeps its sealed history.
Every export traces back
Reports and documents carry a QR gateway to their live record.
A COBie asset handoff
Alongside the full export: the asset list in the shape a facilities system expects.
The completeness figure is real, because it is the register.
The package is built from steps that actually closed. Nobody types a percentage. When it says 100%, every required document was reviewed and every required step holds its proof.
Scheduling and the billing bridge
Quality-aware planning, and billing that prices the work that was actually proven.
A schedule that tells the truth
A task tied to a case cannot claim done; it completes itself when the case closes. Late shipments flag downstream work.
Know what's missing before the day arrives
The look-ahead names the missing documents and room-access needs ahead of time.
Bill only what you proved
Billing lines come from closed inspections and worked days, and the invoice is pushed to your own QuickBooks. Veristep never holds a dollar.
Seven screens, live from a real job. No account.
Put one of your jobs in it.
Thirty days, no card, your whole crew, every feature. A workspace with a job already in it. Exports and downloads switch on when you upgrade.