Still movingin progress
The package updates while the job is still running.
Data Center A again.
Concrete pour card — CRAH-11
CRAH-11 · Computer Room Air Handler 11 · Data Center A — Commissioning
1 of 4 required steps hold their evidence
- ✓Formwork and rebar per drawingspass · captured on siteChecklist
- Slump test in rangeReading in range
- Pre-pour condition photographedPhoto
- Pour release signatureSignature
Next on this card: Slump test in range. The moment it is captured, the package on screen one moves. Nobody assembles anything at the end, because the end is just the last step that closed.